Construction Complete
Work commenced in 2011 on the reconfiguration of the Tay Road Bridge vehicle access ramps. Through a phased construction period the existing ramps were removed and either replaced or realigned to serve the new road network that serves the Waterfront area.
A timelapse video is available showing the demolition and renewal of the northbound ramp connecting with the Southern Boulevard. View the video on Youtube