Rail Station Construction

This page only shows the construction images taken during the delivery of Dundee's main railway station. View the Railway Station Page here

Construction Images:

(August 2018)

Rail Station Cycle Parking

Construction of a covered cycle shelter with capacity for 120 bicycles. Funded by Abellio Scotrail and the Regional Transport Partnership, this shelter is located adjacent to the short-stay car park located to the west of the station building. Cycle parking is also currently available at the on-street stands to the east of the building.

(June 2018)

Dundee Railway Station Construction

Dundee Railway Station Construction

Dundee Railway Station Construction

Dundee Railway Station Hotel Construction

Dundee Railway Station Hotel Construction

Dundee Railway Station Hotel Construction

(May 2018)

Dundee Rail Station

Rail Station Dundee

(April 2018)

Dundee Railway Station Construction

Dundee Railway Station Construction

(March 2018)

Dundee Rail Station Construction

Dundee Rail Station Construction

Dundee Rail Station Construction

Dundee Rail Station Construction

(February 2018)

Sleeperz Hotel Dundee

Dundee Railway Station

(November 2017)

Internal rooms at Dundee Rail Station

external cladding on the new Dundee Rail Station

Var Park Access Road

 

(October 2017)

Exterior construction work: New car park/ cycle parking & drop off areas:

New Rail Station Parking Area

Dundee Rail Station Under Construction

 

 

(September 2017)

New Rail Station Concourse Construction

(August 2017)

Dundee Rail Station Construction in August 2017

 

(July 2017)

rail station construction

rail station construction

(May 2017)

Rail Station Dundee

View from new Rail Station

Rail Station Dundee

 

(April 2017)

These images show the new station concourse area with the main doorframes now being installed. Work is continuing at the upper levels to form the hotel accommodation with bathroom units having now arrived on site, ventilation ducting being installed and internal walls being formed.

Rail Station Interior during construction

(March 2017)

 

Dundee Rail Station Construction

Dundee Rail Station Construction

(February 2017)

Rail station construction

(December 2016)

Dundee Rail Station Construction

 

(November 2016)

Dundee Railway Station Under Construction

(October 2016)

Dundee Rail Station Construction

(September 2016)

With the foundations now complete the construction of the steel frame is well underway: The building frame will be completed over the next four months. The canopy frame which links the main concourse to the platform building is already in place. The frame is being constructed in modules away from the site, which allows them to be constructed safely without disruption to the railway. These modules are then lifted into place using two 600-tonne capacity cranes during the night when the railway is closed to trains. A video showing the frame being lifted into place is available.

Video of station frame being lifted into place

Video footage showing the Station framework being hoisted into place

 

New Railway Station Framework

Rail Station Steel frame

Dundee Railway Station Construction Dundee Railway Station Construction

Dundee Railway Station Construction

(August 2016)

The steel frame for the new station building arrived during August. Work on the foundations are complete and the erection of the steel frame has now begun.

Steelwork frame at Dundee Rail Station

Rail Station Foundations Rail Station Construction

Arrival of steel frame for Rail Station

 

 

 

 

 

(July 2016)

Dundee Rail Station Construction

Dundee Rail Station Construction

(May 2016) In the early hours of Wednesday 25 May the first two sets of structural beams were laid above the main East Coast Rail line. This work was undertaken overnight between 01:30hrs and 05:30hrs to avoid disruption to train services.

Railway Station Construction Dundee

Dundee Railway Station

 

(April 2016) Piling works to the north and south of the Railway are expected to be complete by the end of April. the next phase is to progress towards the construction of a concrete bridge over the railway in order to support the new station building.

Rail Station construction of foundation piles in 2016

 

(Jan 2016) Work to provide protection for the main east coast rail line are now in place with construction crews preparing the site:

Dundee Railway Station Construction Works

 

(May 2015): Works to clear the construction site are now complete - with the removal of the previous station entrance building and platform access as well as a former engineering building to the north. A temporary ticket hall and entrance to the Station is currently available on Riverside Drive.

Dundee Railway Station Construction Site Overview

Dundee Railway Station Construction Site

 

 

.

Central Waterfront - Work Underway